Site Drawings
PHASE I -- MIDDLE/HIGH SCHOOL BUILDING
This approximately 30,000-square-foot first building will ultimately serve as the high school building when future phases are completed. It will consist of approximately 22 classrooms with a capacity of 300 students, media center/library, computer lab, science lab, art suite, and administrative offices. The building will be attached to the north east corner of the current gymnasium at the south campus of Whitesburg Baptist Church, currently known as the Recreational Outreach Center (ROC). It will face toward Whitesburg Drive. The school will share use of some of the current space in the ROC. This use, along with other temporary alternatives being considered, will allow the entire school to move to the new campus. Our goal for this move is the fall of 2013.
The long range plan for Whitesburg Christian Academy is to provide facilities for anticipated future growth in the number of students. These phases will be added as God brings more students our way and will come in the order that the need is experienced. Additional athletic facilities besides a competitive gymnasium, such as soccer and football fields will be added to the existing baseball and softball fields as our athletic programs grow. A possible plan for these phases is outlined below.
PLANS FOR THE FUTURE
PHASE II -- COMPETITIVE GYMNASIUM
PHASE III -- GRAMMAR SCHOOL BUILDING
PHASE IV – FINE ARTS BUILDING/AUDITORIUM
PHASE V -- MIDDLE SCHOOL ADDITION